Project

The Mława Wind Park is located in central Poland, in Masovian Voivodeship, mławski county. It consists of seventeen wind turbines situated in Wieczfnia Kościelna commune, near the villiges of Kulany, Kuklin, Windyki, Grzybowo, Bąki and Uniszki Zawadzkie.

Both social context and environmental issues were considered when planning the locations for the turbines. Several analyses and research had been carried out to ensure compliance with the noise standards and that the impact on the natural environment is minimized. The Wind Farm has been placed outside any protected areas or particularly valuable landscapes. The turbines location was determined with best available practices criteria and meets all legal requirements necessary.

In this Project 2.2 MW Vestas V110 2.2 turbines will be used and the total power of the Mława Wind Farm will be 37.4 MW. Each turbine will be 180 metres high with a rotor diameter at 110 metres.

The construction of the Wind Farm has started in first half of 2020 and the planned completion is scheduled for the end of 2021.

The construction site is managed by V-Ridium Power Services Sp. z o.o. The company has several years of experience in renewable energy projects implementation. The investment is financed by the European Bank for Reconstruction and Development (EBRD).